In this job, we replaced the gate operator, which was already too old and not working properly.
The gate track was very old and began to corrode and fall apart.
First, we built a concrete base frame for the track and added support. Once the concrete hardened, we placed the track and reinstalled the gate.
We put edging around the track's concrete base to keep dirt and soil from getting on the track and causing problems with the gate while its moving.
We removed the old gate operator and replaced it with an ALLOMATIC SL100 gate operator; we also put back the new chain and chain brackets.
The gate functions properly, and the customer is satisfied with the results.